Active facilityCedar Ridge Distribution Center
Synthetic data synced
MH
PRJ-GAR-DEMO-001

Cedar Ridge Roof Renewal

Synthetic 92,000-square-foot roof renewal with material reconciliation, field evidence, open-loop control, and progress reporting.

Active ConstructionConfirm site session
Certainty score82Visible operating completeness
Field progress36%Target Sep 18, 2026
Open loops3All assigned with next actions
Material variances1Controlled in the open-loop register
Canonical context

Project overview

Single project record
ClientNorthstar Facilities Group
FacilityCedar Ridge Distribution Center
Address4100 Atlas Way, Mesa Verde, CO 80000
Project windowAug 11, 2026 → Sep 18, 2026
Ownership gate

Accepted handoff

Accepted
Relationship ownerRiley Chen
Execution ownerMorgan Hale
1 visible exceptionFinal curb detail revision is pending and remains assigned to Riley Chen.
Accepted Aug 12, 12:05 PM MDT
Facility memory spine

Place hierarchy

FacilityCedar Ridge Distribution Center
BuildingMain Distribution Building
ROOF-GAR-EASTEast Logistics Roof56,000 sq ft · TPO membrane
ROOF-GAR-WESTWest Office Roof36,000 sq ft · TPO membrane
Dual ownership

Project team

RC
Riley ChenRelationship Owner
USR-GAR-REL
MH
Morgan HaleExecution Owner
USR-GAR-EXE
AB
Avery BrooksWork Owner
USR-GAR-WRK
DO
Dana OrtizGovernance Owner
USR-GAR-GOV
Capture once

Evidence and outputs

Open session ledger
P
EVD-GAR-001East roof arrival overviewEast Logistics Roof
C
EVD-GAR-002Delivery insulation countGate 2 delivery zone
P
EVD-GAR-003Mechanical Curb 12 conditionEast Logistics Roof / Mechanical Curb 12
P
EVD-GAR-004Drain 07 corrected protectionEast Logistics Roof / Drain 07
Generated viewSynthetic Daily Progress Report - August 14Draft · version 1
Audit trail

Recent operating events

Material variance openedLOOP-GAR-001 assigned to Avery Brooks
Site session confirmedMorgan Hale confirmed East Logistics Roof
Handoff acceptedExecution ownership transferred with one visible exception