Daily Progress

Synthetic Daily Progress Report - August 14

RPT-GAR-001 · Version 1
ProjectCedar Ridge Roof RenewalPRJ-GAR-DEMO-001
FacilityCedar Ridge Distribution Center4100 Atlas Way, Mesa Verde, CO 80000
Prepared byMorgan HaleAug 14, 10:00 AM MDT
StatusDraftGenerated from existing records
01

Shift summary

WeatherClear, 72-84 F
Crew count14
Work completed

East Roof tear-off and insulation placement progressed through Zone E-3.

Next shift

Recover missing insulation bundles and continue membrane placement.

02

Material reconciliation

ItemExpectedInspectorReceiverVarianceControl
Polyiso insulation bundleMAT-GAR-001120 bundle118 bundle118 bundle-2LOOP-GAR-001
TPO membrane rollMAT-GAR-00242 roll42 roll42 roll0Matched
Bonding adhesive pailMAT-GAR-00318 pail18 pail18 pail0Matched
03

Contextual evidence

01
East roof arrival overview

East Logistics Roof arrival overview showing the active work zone.

EVD-GAR-001 · East Logistics Roof
02
Mechanical Curb 12 condition

Mechanical Curb 12 northwest corner condition requiring design confirmation.

EVD-GAR-003 · East Logistics Roof / Mechanical Curb 12
03
Drain 07 corrected protection

Drain 07 temporary protection corrected and ready for verification.

EVD-GAR-004 · East Logistics Roof / Drain 07
04

Open-loop status

Open
Two insulation bundles missingAvery Brooks · Confirm supplier recovery ETA and record delivery disposition.
LOOP-GAR-001
Waiting
Mechanical Curb 12 detail confirmationRiley Chen · Attach the received detail and confirm the field treatment.
LOOP-GAR-002